A little planning. A lot less stuff.   Australian equipment hire planning.
Project plannerCompare supplier quotesHire adviceSecurity hireSupplier starting points

Project guides / Plan lawn aeration

Your project checklist

Plan lawn aeration

A little site preparation can prevent a wasted hire day.

Five things to organise

Use this checklist to prepare a supplier brief. It is not an operating method.

  1. Ask a local lawn specialist whether aeration suits your grass, soil and season.
  2. Measure lawn area, gates and access routes. Note slopes and steps.
  3. Locate irrigation, cables and shallow services. Mark obstructions before work.
  4. Ask the hire business about machine weight, transport, loading and safe operating limits.
  5. Compare hire with a gardener’s service, including your transport, time and clean-up.
This is a planning checklist. It is not a technical method or substitute for supplier instruction and professional advice.

Got a project in mind?

Turn the idea into a clear equipment brief.

Plan your hire ↗